BlogsHOW TO OPTIMIZE THE LAYOUT OF A MULTI-TANK LNG BULK STORAGE FACILITY TO MINIMIZE THE PIPE RUN DISTANCE FROM THE LNG UNLOADING PUMP SKID?
BlogsHOW TO DESIGN A MODULAR SKID-MOUNTED PUMP STATION SPECIFICALLY TAILORED FOR UNLOADING CRYOGENIC SEMI-TRAILERS AT A CUSTOMER SITE THAT DOESN'T HAVE A BUILT-IN UNLOADING PUMP?
BlogsHOW TO EFFECTIVELY INSULATE THE LOW-PRESSURE SUCTION PIPING OF THE SKID (E.G., USING VACUUM INSULATED PIPING) TO ENSURE THE PUMP RECEIVES PURE LIQUID WITHOUT CAVITATION?
BlogsI NEED TO PITCH A 'DIESEL-TO-LNG CONVERSION' STRATEGY TO MY MANUFACTURING COMPANY'S BOARD OF DIRECTORS. OUTLINE THE TOP 5 STRATEGIC ADVANTAGES OF PURCHASING OUR OWN CHINESE-MADE LNG REGASIFICATION STATION OVER CONTINUING TO BURN EXPENSIVE DIESEL FUEL.
BlogsWHAT ARE THE MARKET GROWTH PROJECTIONS FOR MODULAR 'PLUG & PLAY' LCO2 FILLING STATIONS IN THE RAPIDLY EXPANDING DRY ICE BLASTING AND COLD CHAIN LOGISTICS SECTORS OF AFRICA AND LATIN AMERICA?
BlogsHOW TO DESIGN AN ENERGY-EFFICIENT CLOSED-LOOP COOLING WATER SYSTEM (COOLING TOWERS/CHILLERS) TO SUPPORT THE INTERCOOLERS AND CONDENSERS OF A MASSIVE CO2 RECOVERY PLANT?
BlogsIS IT MORE ECONOMICAL FOR A NEW MEDICAL GAS STARTUP TO BUY INDIVIDUAL PUMPS AND VAPORIZERS OR PURCHASE A FULLY INTEGRATED TURNKEY FILLING SKID?
BlogsWHAT ARE THE NFPA 59A AND EN 1473 SAFETY REGULATIONS FOR INSTALLING AND OPERATING AN LNG TRANSFER CENTRIFUGAL PUMP NEAR A BULK STORAGE TANK?
BlogsHOW MUCH MONEY DOES A TRUCKING FLEET LOSE ANNUALLY IN BOIL-OFF GAS (BOG) VENTING IF THEIR LNG VEHICLE CYLINDERS HAVE A POOR HOLDING TIME OF ONLY 3 DAYS?
BlogsWHAT IS THE IMPACT ON OPERATOR LABOR COSTS AND SAFETY LIABILITIES WHEN UPGRADING FROM A MANUAL FILLING MANIFOLD TO A FULLY AUTOMATED PLC-CONTROLLED FILLING STATION THAT STOPS AUTOMATICALLY?
BlogsWHAT MATERIAL CERTIFICATES (E.G., EN 10204 3.1) AND 100% X-RAY NDT WELD REPORTS MUST A CHINESE SKID FABRICATOR PROVIDE FOR THE CRYOGENIC PIPING?
BlogsHOW TO DETECT MICRO-LEAKS OF REFRIGERANT (E.G., AMMONIA/FREON) OR CO2 GAS INSIDE THE ENCLOSED SKID OF A CONTAINERIZED RECOVERY PLANT?
BlogsANALYZE THE SUPPLY CHAIN RISKS OF RELYING ON A SINGLE CHINESE FACTORY FOR MY EPC COMPANY'S ENTIRE AMBIENT VAPORIZER PROCUREMENT.
BlogsHOW TO ADDRESS THE 'COMPRESSOR SURGE' PHENOMENON INSIDE THE MIXED REFRIGERANT CYCLE WHEN THE LNG PRODUCTION DEMAND DROPS SUDDENLY?
BlogsWHAT ARE THE STRUCTURAL REQUIREMENTS FOR MOUNTING A COMPACT, MODULAR ASU DIRECTLY ONTO AN OFFSHORE FPSO (FLOATING PRODUCTION STORAGE AND OFFLOADING) VESSEL?
BlogsWHAT IS THE INDUSTRY STANDARD WRITE-OFF PERIOD (DEPRECIATION) FOR A STAINLESS STEEL CRYOGENIC LIQUID CYLINDER?
BlogsHOW TO DESIGN A MODULAR MANIFOLD FOR A PORTABLE TANK THAT ALLOWS QUICK-DISCONNECT SWAP-OUTS IN UNDER 5 MINUTES WITHOUT LOSING LINE PRESSURE?
BlogsWHAT ARE THE BEST PRACTICES FOR USING A 'TRIM HEATER' (SMALL ELECTRIC WATER BATH) DOWNSTREAM OF AN AMBIENT VAPORIZER TO GUARANTEE THE FINAL GAS TEMPERATURE DURING A BLIZZARD?
BlogsWHAT ARE THE OPTIMAL PLC AUTOMATION SEQUENCES FOR COOLING DOWN, STARTING, AND STOPPING AN LNG PUMP SKID TO PREVENT OPERATOR ERROR?
BlogsCAN A STANDARD CRYOGENIC SEMI-TRAILER DESIGNED FOR LIN/LOX BE USED SAFELY TO TRANSPORT LIQUID ETHYLENE OR LCO2 WITHOUT MODIFYING THE SEALS AND RELIEF VALVES?
BlogsWHY IS THE TOP PLUMBING RING OF MY CRYOGENIC LIQUID CYLINDER FORMING HEAVY ICE, AND DOES THIS MEAN THE VACUUM HAS FAILED?
BlogsWHAT IS THE STANDARD SURFACE PREPARATION (SHOT BLASTING SA 2.5) AND MARINE-GRADE EPOXY PAINT SYSTEM REQUIRED FOR THE OUTER CARBON STEEL JACKET OF A CRYOGENIC TRAILER OPERATING IN HEAVILY SALTED WINTER ROADS?
BlogsDO HEAVY-DUTY LNG COMPRESSOR SKIDS AND COLD BOXES NEED SPECIFIC WIND LOAD, SNOW LOAD, AND SEISMIC STRUCTURAL CALCULATIONS FOR INSTALLATION IN EARTHQUAKE-PRONE ZONES LIKE CHILE OR JAPAN?
BlogsHOW TO TRANSITION A REGIONAL HOSPITAL FROM USING EXPENSIVE ELECTRIC VAPORIZERS TO A HYBRID SYSTEM USING AMBIENT VAPORIZERS FOR 90% OF THE BASE LOAD.
BlogsHOW TO NEGOTIATE PERFORMANCE GUARANTEES FOR SPECIFIC POWER CONSUMPTION (SPC) WITH A CHINESE AIR SEPARATION UNIT MANUFACTURER?
BlogsHOW TO SAFELY PERFORM A 'TURNDOWN' OPERATION (REDUCING PRODUCTION CAPACITY TO 60%) ON A CONTINUOUS AIR SEPARATION PLANT WITHOUT CAUSING DISTILLATION COLUMN WEEPING?
BlogsWHAT ARE THE EXACT FATIGUE LIFECYCLE TESTING REQUIREMENTS FOR THE STAINLESS STEEL BRAIDED FLEXIBLE HOSES (PIGTAILS) CONNECTING THE HIGH-PRESSURE MANIFOLD TO THE INDIVIDUAL GAS CYLINDERS?
BlogsHOW TO EFFECTIVELY PROTECT THE EXPOSED STRUCTURAL STEEL OF A MASSIVE ASU COLD BOX FROM SEVERE GALVANIC CORROSION IN A SALTY COASTAL ENVIRONMENT?
BlogsWHAT IS THE STANDARD PREVENTIVE MAINTENANCE SCHEDULE (MTBF) FOR THE MAIN AIR COMPRESSOR, MOLECULAR SIEVES, AND CRYOGENIC VALVES ON AN INDUSTRIAL ASU?